PROJECT OF PROVIDING AND INSTALLING POLYETHYLENE PIPES , VALVES AND SEPTIC TANKS (EDLIB AND AZAZ
Installation project of polyethylene water network, valves and manhole pits (edlib-Azaz) 45,000 meters length water network was implemented in edlib regions (Harem, Armanaz, Bayatas, Korkinia, Kafr Arruk, Ras AlHosn, Killi, Maaret Misrin 20000 meters of water network... لـ DeltaT | 08/03/2020 | Completed work
ESTABLISHING EDUCATION SITES FROM THE CARAVANS IN THE NORTHERN EDLIB CAMPS
Five educational sites have been established and prepared in camps of (Rahma 1 ,rahma 3, Kfarehmoun, Farj Allah and Kfar Aweid) Starting Date: 08/03/2020 Implementation duration: 30 days Project supervision committee: Ataa Humanitarian Relief Association The project... لـ DeltaT | 05/03/2020 | Completed work
ALMOKAWAMA CAMP’S FIELD PREPARATION PROJECT
Al Mukawame camp preparation works in Azaz … Scraping, leveling the land and lying it with gravel Start Date: 05/03/2020 Implementation duration: 20 days Project supervision committee: Ihsan Relief and Development The project was completed and handed over:... لـ DeltaT | 02/03/2020 | Completed work
SANITATION WORKS PROJECT IN ZARDANA/EDLIB
Sanitation network project has been implemented using concrete pipes with a diameter of 30, 40, 50 cm , with a total 2000 meters length , cleaning sewer lines, manholes Starting date: 02/03/2020 Implementation duration: 53 days Project supervision committee: Relief...Recent Posts
- Kafr Rouhin Wastewater Treatment Plant
- Establishment of the main sewer line and connecting the camps to the main sewer line in Idlib
- Implementing a high water tank and installing a water and sanitation network in the camps in Afrin and Jandires
- Installation of 2000 liter polyethylene water tanks in Idlib
- Rehabilitation of the sewage network in Azaz and Al-Bab
Recent Comments