Providing two generator 600 KVA and two generator 200 KVA with ATS systems
Provision of a pump with a capacity (65 cubic meters per hour ,raises water to 265meter high) with all the electrical equipment, cables and control panels …
Starting Date: 01/31/2020
Implementation duration: 30 days
Project supervision committee:
BINAA for Development
The project was completed and handed over on: 29.02.2020