![Establishment of the main sewer line and connecting the camps to the main sewer line in Idlib](https://deltatcompany.com/wp-content/uploads/2024/04/IHR-main-sewer-line-1-1.jpg)
![Establishment of the main sewer line and connecting the camps to the main sewer line in Idlib](https://deltatcompany.com/wp-content/uploads/2024/04/IHR-main-sewer-line-1-1.jpg)
Recent Posts
- Establishment of the main sewer line and connecting the camps to the main sewer line in Idlib
- Implementing a high water tank and installing a water and sanitation network in the camps in Afrin and Jandires
- Installation of 2000 liter polyethylene water tanks in Idlib
- Rehabilitation of the sewage network in Azaz and Al-Bab
- Rehabilitation of the sewerage network in Harem
Recent Comments