![WATER PUMPS AND NETWORK MAINTENANCE PROJECT IN IDLIB](https://deltatcompany.com/wp-content/uploads/2021/09/Web_Photo_Editor-21-1.jpg)
![WATER PUMPS AND NETWORK MAINTENANCE PROJECT IN IDLIB](https://deltatcompany.com/wp-content/uploads/2021/09/Web_Photo_Editor-21-1.jpg)
لـ DeltaT | 23/08/2021 | Completed work
![PROJECT OF SEWAG NETWORK REHABILITATION IN TAL KARAMA](https://deltatcompany.com/wp-content/uploads/2021/08/Web_Photo_Editor-2021-09-03T143753.258-1.jpg)
PROJECT OF SEWAG NETWORK REHABILITATION IN TAL KARAMA
Rehabilitation of sewage network in Tal-Alkarama village, Al-Dana district in the northern rural of Idlib. Project supervision committee: International Humanitarian... لـ DeltaT | 10/08/2020 | Completed work
![PROJECT TO ESTABLISH A RAIN DRAINAGE SYSTEM AND DRILLING MANHOLE PITS IN HARBANUŞ AND SHEIKH BAHIR CAMPS IN IDLIP RURAL](https://deltatcompany.com/wp-content/uploads/2020/09/WhatsApp-Image-2020-09-07-at-10.14.58-AM-794x675.jpeg)
PROJECT TO ESTABLISH A RAIN DRAINAGE SYSTEM AND DRILLING MANHOLE PITS IN HARBANUŞ AND SHEIKH BAHIR CAMPS IN IDLIP RURAL
Establishing a rain drainage system in Harbanoş and Sheikh bahır camps in rural Idlib and digging manholes and providing all necessary accessories and excavation works. Starting Date: 10/08/2020 implementation duration:35 days The project supervising authority: BINAA...Recent Posts
- Establishment of the main sewer line and connecting the camps to the main sewer line in Idlib
- Implementing a high water tank and installing a water and sanitation network in the camps in Afrin and Jandires
- Installation of 2000 liter polyethylene water tanks in Idlib
- Rehabilitation of the sewage network in Azaz and Al-Bab
- Rehabilitation of the sewerage network in Harem