![Establishment of the main sewer line and connecting the camps to the main sewer line in Idlib](https://deltatcompany.com/wp-content/uploads/2024/04/IHR-main-sewer-line-1-1.jpg)
![Establishment of the main sewer line and connecting the camps to the main sewer line in Idlib](https://deltatcompany.com/wp-content/uploads/2024/04/IHR-main-sewer-line-1-1.jpg)
لـ DeltaT | 01/08/2023 | Completed work
![Implementing a high water tank and installing a water and sanitation network in the camps in Afrin and Jandires](https://deltatcompany.com/wp-content/uploads/2024/04/MWL-Water-and-sanitiation-network-1-1.jpg)
Implementing a high water tank and installing a water and sanitation network in the camps in Afrin and Jandires
Implementing a high water tank in addition to installing a water and sewage network in the camps in both the cities of Afrin and Jindires. Project supervision committee: Mercy Without Limits –... لـ DeltaT | 10/06/2023 | Completed work
![Rehabilitation of the sewage network in Azaz and Al-Bab](https://deltatcompany.com/wp-content/uploads/2024/04/Azaz-1-1.jpg)
Rehabilitation of the sewage network in Azaz and Al-Bab
Rehabilitation of the sewage network in Azaz and al-Bab in the northern countryside of Aleppo. Project supervision committee BINAA for... لـ DeltaT | 30/05/2023 | Completed work
![Rehabilitation of the sewerage network in Harem](https://deltatcompany.com/wp-content/uploads/2024/04/Ihsan-Sewage-networks-in-Harem-4-1.jpg)
Rehabilitation of the sewerage network in Harem
Providing materials, works, and everything necessary to rehabilitate the sewage network in Harem. Project supervision committee Ihsan Relief and... لـ DeltaT | 10/08/2020 | Completed work
![PROJECT TO ESTABLISH A RAIN DRAINAGE SYSTEM AND DRILLING MANHOLE PITS IN HARBANUŞ AND SHEIKH BAHIR CAMPS IN IDLIP RURAL](https://deltatcompany.com/wp-content/uploads/2020/09/WhatsApp-Image-2020-09-07-at-10.14.58-AM-794x675.jpeg)
PROJECT TO ESTABLISH A RAIN DRAINAGE SYSTEM AND DRILLING MANHOLE PITS IN HARBANUŞ AND SHEIKH BAHIR CAMPS IN IDLIP RURAL
Establishing a rain drainage system in Harbanoş and Sheikh bahır camps in rural Idlib and digging manholes and providing all necessary accessories and excavation works. Starting Date: 10/08/2020 implementation duration:35 days The project supervising authority: BINAA...Recent Posts
- Establishment of the main sewer line and connecting the camps to the main sewer line in Idlib
- Implementing a high water tank and installing a water and sanitation network in the camps in Afrin and Jandires
- Installation of 2000 liter polyethylene water tanks in Idlib
- Rehabilitation of the sewage network in Azaz and Al-Bab
- Rehabilitation of the sewerage network in Harem
Recent Comments