![Implementing a high water tank and installing a water and sanitation network in the camps in Afrin and Jandires](https://deltatcompany.com/wp-content/uploads/2024/04/MWL-Water-and-sanitiation-network-1-1.jpg)
![Implementing a high water tank and installing a water and sanitation network in the camps in Afrin and Jandires](https://deltatcompany.com/wp-content/uploads/2024/04/MWL-Water-and-sanitiation-network-1-1.jpg)
لـ DeltaT | 17/06/2023 | Completed work
![Installation of 2000 liter polyethylene water tanks in Idlib](https://deltatcompany.com/wp-content/uploads/2024/04/Polyethylene-water-tanks-2-1.jpg)
Installation of 2000 liter polyethylene water tanks in Idlib
Provision and installation of 2000-liter polyethylene water tanks with all the necessary base and accessories in Idlib. Project supervision committee Ihsan Relief and...Recent Posts
- Establishment of the main sewer line and connecting the camps to the main sewer line in Idlib
- Implementing a high water tank and installing a water and sanitation network in the camps in Afrin and Jandires
- Installation of 2000 liter polyethylene water tanks in Idlib
- Rehabilitation of the sewage network in Azaz and Al-Bab
- Rehabilitation of the sewerage network in Harem
Recent Comments