لـ DeltaT | 19/09/2020 | Completed work
STONE FLOOR PROJECT (ALKAIBA ROAD)
Gravel laying on Al-Kaiba road… . Starting Date: 19/09/2020 Implementation duration: 10 days Project supervision committee: Ihsan Relief and Development The project was completed and handed over on... لـ DeltaT | 10/08/2020 | Completed work
PROJECT TO ESTABLISH A RAIN DRAINAGE SYSTEM AND DRILLING MANHOLE PITS IN HARBANUŞ AND SHEIKH BAHIR CAMPS IN IDLIP RURAL
Establishing a rain drainage system in Harbanoş and Sheikh bahır camps in rural Idlib and digging manholes and providing all necessary accessories and excavation works. Starting Date: 10/08/2020 implementation duration:35 days The project supervising authority: BINAA... لـ DeltaT | 25/07/2020 | Completed work
RAIN CHANNEL EXCAVATION PROJECT (MOLHAM CAMP)
Digging a rain canal for Molham camp … Following up the rain canal works…. concrete pouring of the canal walls After completing the construction of the canal walls, starting pouring the roof of the canal The drilling of the rain canal project,... لـ DeltaT | 15/07/2020 | Completed work
PREPARATION OF A WATER WELL WITH A SOLAR ENERGY SYSTEM AND WATER NETWORK (ALBUNYAN ALMARSOS CAMP)
Some of the preparation works in Al-Bunyan Al-Marsous camp in Jarablus. Preparing and installing a well … Starting date: 15/07/2020 implementation duration: 36 days Project supervision committee: Ihsan Relief and Development Completion of drilling the...Recent Posts
- Kafr Rouhin Wastewater Treatment Plant
- Establishment of the main sewer line and connecting the camps to the main sewer line in Idlib
- Implementing a high water tank and installing a water and sanitation network in the camps in Afrin and Jandires
- Installation of 2000 liter polyethylene water tanks in Idlib
- Rehabilitation of the sewage network in Azaz and Al-Bab